क्या होता है
Sprint 9 already stores all seventeen boxes and refuses an incision until the time-out is stamped. That is worth having and it is not safety. A checklist ticked from memory at the end of the list prevented nothing, and every published audit of these finds the same gap between the paperwork and the pause. Three things were unanswerable, and this sprint answers them.
अब सिस्टम क्या करता है
/ot/checklist — Operation theatre → Safety checklist, permission Ot.Schedule: six tiles and two tabs — The board (each case on the day with its three phases, the pause timer, the exceptions and the stop) and Compliance (per phase, with the pause and the excused items beside it). One export.
कहाँ मिलेगा
Operation theatre · /ot/checklist
